Company | References | Products | Services | Fabrication | Brochures | Videos | News
Quickfinder
 
 
Google AdSense 
>> Home  >>  References  >>  Power plants
Bulk materials handling

Coaling installation
Germany

conveyor system, longitudinal stockyard

1x stacker ST1000.38
1x portal scraper KP1000.56
1x tripper car TC1200

hard coal 1000 t/h

Power plants
 <<all>> 

Pos. 1 12    

Bulk materials handling
Power Plants
Coaling installation
Germany

conveyor system, longitudinal stockyard

1x stacker ST1000.38
1x portal scraper KP1000.56
1x tripper car TC1200

hard coal 1000 t/h

 
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 

Top 13    

Mineral processing
Power Plants
FGD - plant
Poland

mineral grinding plant

1x ball mill SBc280x650

limestone

 
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 

Top 14    

Bulk materials handling
Mineral processing
Power Plants
Coaling installation
Germany

crushing plant, conveyor system
with slot bunker, xylit-separation and crushing dedusting plant

16x bunker
2x impact crusher PB1010

coal 2400 t/h
xylit 5 t/h
bunker capacity 16 x 500 m³

 
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 

Top 15    

Bulk materials handling
Power Plants
FGD - plant
Germany

conveying system, longitudinal stockyard

1x portal scraper KP750.28

FGD - gypsum 750 t/h

 
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 

Top 16    

Bulk materials handling
Mineral processing
Power Plants
FGD - plant
Germany

conveying system, longitudinal stockyard,
mineral grinding plant
stockyard capacity 16600 t

1x portal scraper KP500.31
4x ball mill SBc260x600
1x wagon thawing up station WTU81x6
1x train loading

limestone 600 t/h
FGD - gypsum 800 t/h

 
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 

Top 17    

Bulk materials handling
Power Plants
FGD - plant
Germany

conveying system
to supplying and disposal, stockyard capacity 12000 t FGD - gypsum / 13000 t limestone

1x stacker ST600.17
1x side scraper KS300.6
1x portal scraper KP750.28
1x tripper car TC1000
1x wagon thawing up station WTU82x6
1x wagon unloading
1x train loading

limestone 300 t/h
FGD - gypsum 750 t/h

 
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 

Top 18    

Bulk materials handling
Power Plants
Coaling installation
Germany

conveying system

1x trench reclaimer G500

coal 1800 t/h

 
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 

Top 19    

Bulk materials handling
Power Plants
Coaling installation
Greece

conveying system

coal 4000 t/h

 
 
 
 
 
 
HighRes. Picture (RGB) 
 
   
 

Top 20    

Bulk materials handling
Port installations
Power Plants
Power station
Germany

handling system

2x CONTI ship unloader CSU1100.9S

coal 1100 t/h

 
 

Top 21    

Bulk materials handling
Power Plants
Coaling installation
Power station

Germany

handling system, conveyor system

1x ship unloader GUL1000.13KG
2x pipe conveyor PC400x385
1x chain conveyor - drag bar feeder TKF1268x10
4x belt conveyor stationary GF1200x350/242/195/185
4x belt conveyor stationary GF1200x325/194/90/45
6x belt conveyor stationary GF1400x104/38/32
4x belt conveyor mobile GF1400x19

hard coal 1000 t/h

 
 
 <<all>> 

English Deutsch Francais Espanol 中文 русский